I glue the leak with Industrial Hi- Temp sealant and waited for 2 days for it to be completely dried. as you can see, I applied a very thick layer outside and I also applied a very thin layer on the inside in the groove between the rubber and the metal. I want to make sure that it is completely dry and harden and stick before I run the engine again, no glue should be suck in to the valve by the engine vacuum, or it may block the valve.
Thursday, November 10, 2011
2011 11 09 Intake Manifold Glued
I glue the leak with Industrial Hi- Temp sealant and waited for 2 days for it to be completely dried. as you can see, I applied a very thick layer outside and I also applied a very thin layer on the inside in the groove between the rubber and the metal. I want to make sure that it is completely dry and harden and stick before I run the engine again, no glue should be suck in to the valve by the engine vacuum, or it may block the valve.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment